| 01. Target |
No. of worker x
working hour x 60 / SMV x expected efficiency. |
| 02. Target |
60/SMV. |
| 03. Line/Team target |
(60/SMV)x
Present worker x Organization efficiency . |
| 04. Target per day |
Working
hour x 60 x No. of operator / Target SMV. |
| 05. Capacity |
Average
of total observe time x 1.66 + 15% Allowance / 60. |
| 06. Factory capacity |
No.
of operator x working minutes + Present % x average factory efficiency. |
| 07. Capacity per day |
Present
operator x working hour x organization efficiency x Attendance. |
| 08. Weekly capacity |
No.
of operators x Absenteesm x Clock minutes per week x Average factory efficiency. |
| 09. Marker efficiency |
Area
of patterns in the marker / Total area of the marker x 100. |
| 10. Load |
(Contract
size x work content) contract 1+ (Contract size x work content) Contract 2 +
etc. |
| 11. Load |
Order
quantity x Work content (SMV of garments). |
| 12. Observe time |
Total
cycle time / No. of cycle. |
| 13. Basic time |
Avarage
of observe time X Rating %. |
| 14. Sam |
Basic
time x Allowance. |
| 15. Rating |
Observe
time x Standard rating / Standard rating. |
| 16. Cycle time |
60
/ Team target. |
| 17. Pitch time |
Total
SMV / Present operator. |
| 18. Efficiency |
Earn
hour / Available hour x 100 |
| 19. Efficiency |
SMV
/ Total time. |
| 20. Earn hour |
SMV
x Production / 60. |
| 21. Available hour |
Working
hour x Use machine. |
| 22. Performance |
(Earn
hour / Available hour - Off standard time) x 100. |
| 23. Improvement |
1-(Production
/ Capacity). |
| 24. Balancing efficiency |
1-Balancing
loss. |
| 25. Balancing loss |
AML-TML/AMLx100. |
| 26. Standard time |
Net
operation time x (1+ Ratio of loss time). |
| 27. Daily output |
Working
hours (seconds) + Standard time. |
| 28. Output per operator |
Work
hours (second) / Total time of operations. |
| 29. Required No. of operators |
Targeted
daily output / Daily output per operator. |
| 30. Target daily capacity |
Daily
work hours / Standard process time (SPT). |
| 31. Daily capacity per worker |
Daily
capacity / No. of workers = Daily Work hours / Standard total processing. |
| 32. Organization efficiency |
Pitch
time / Bottle neck process time (x100) = 100/140 x 100 = 71.4% |
| 33. Upper limit |
Pitch
time / Target organization efficiency = 100 / 0.85 = 117.6 seconds. |
| 34. Lower limit |
2
x Pitch time - Upper limit = 2 x 100 - 117.6 = 82.4 seconds. |
| 35. Planned daily work flow |
Daily
work hours / Standard process time (SPT) x organization efficiency. |
| 36. Accumulated avarage time |
Daily
work hours/AccumulatedxNo.of daysxstandard No.of workers in the group/No. of
pieces produced. |
| 37. SMV |
Basic
time + Allowance time + bundle time. |
| 38. DHU |
No.
of deffect observe / No. of garments checked. |
| 39. Booking fabric K.G |
Order
quantity / 12 x Fabric consumption per doz. |
| 40. Garments K.G. |
Total
receive fabric kg - (Save return kg + Jute kg + Wastage fabric kg) |
| 41. Input to sewing pcs. |
Total
in pcs - (Print Embroidery short & wastage + Cutting wastage pcs.) |
| 39. Fabric consumption (CM) |
Length
x chest x 2 x GSM / 1000 / 10000 x 12 + Wastage%. |
| 40. Fabric consumption (Inch) |
Length
x chest x 2 x GSM / 1000 / 1550 x 12 + Wastage%. |
| TML |
Theoratical
machine level. |
| AML |
Actual
machine level. |
| AQL |
Acceptable
quality level. |
| PMTS |
Pre
method time study. |
| GSM |
Gram
squire per miter. |
| BHT |
Bundle
handle time. |
| SUM |
Standard
allocated minutes. |
| TS |
Technical
allowance. |
| TP |
Personal
allowance. |
| TER |
Recovery
allowance. |
| TV |
Total
allowance. |
| WH |
Working
hour. |
ReplyDeleteHappy to inform the success of Online Handbook of Industrial Engineering - 2019 Version - Narayana Rao
Thanks.
ReplyDelete