STANDARD OPERATION PROCEDURES FOR CUTTING
SYSTEM
1.
Department
Structure and Attendance: Cutting must have complete department structure
comprising of all relevant categories to have smooth operational function.
Daily attendance details certified by Cutting in charge must be available in
each section for management information.
2.
Cutting
department must maintain records for fabric receiving in each style.
3.
Cutting in-charge has to follow production plan given by the planning
department.
4. Cutting
section should receive fabric roll width segregation report from stores for
each styles or P.O. Marker making should be done by referring this width
segregation report to maximum utilization of fabric.
5. Daily
work in progress (W.I.P) report to
be maintained by cutting in-charge to review the status of entire process in
cutting department.
6. Pilot / Bulk cut approval: Pilot cut
approval to be given by P.M. with the confirmation from technical manager and
Q.A.M. to proceed with production after reviewing P.P. approval from buyer.
Bulk approval also to be given by F.M. and certified by M.M. Manager.
7. Cut plan to be maintained for each
style/color. This must be prepared by cutting in-charge and should submit to
G.M. through P.M. and Merchandising Manager to obtain approval prior to cutting
of each style.
8.
Table plan to
be prepared by Cutting in charge for days cut plan.
9. Layer sheet must be maintained for each
layer/cut. Pattern must be marked in each layer it self. (e.g. If you have 3
Patterns in Small size each pattern to mark as S1 ,S2 , S3)
10.
Bundle chart
must be prepared by the cutting department before numbering and bundling of
each cut.
11.
Numbering of
each panel must be done and use separate color of sticker for each size.
12. Cut Bundles to stack in separately for
each cut number for issuing. (Must mark Style no. /Cut no. /Size no. /Quantity).
Should keep on a pallet with details
marked such as Cut, Size, and Line to be issued to avoid mix ups.
13. Sending out and receiving of Printing and
Embroidery: A separate coordinator must be assigning to this purpose. He is
responsible for maintaining all relevant documents pertaining to this process
and issue and receives correct quantity. Replacing part and number must be
clearly mentioned in this chart and follow.
·
Coordinator is responsible for re-cutting and
replacing any panel of any bundle and must make sure to replace prior to in
put.
·
Factory must advise printing and embroidery
plant to take over each cut as per the bundle chart to assure quantity is
correct and bundle is in number sequence.
14.
P.M. will distribute quantity to be sewn each line
according to plan and must maintain the bundle chart.
15. Line
supervisor is responsible for receiving correct quantity of each bundle. If any
panel is missing due to rejection in printing or embroidery, panel must be
replaced and bundle must be completed.
16.
Fabric reconciliation to be done at the end of each
style and must submit through P.M. to G.M.
Prepared By: Md. Tarikul Islam